C/M Silo-Farming - Block 11. Comparison
C/M Silo-Farming - Block 11. Comparison
LOOKING AT SUCCESSFUL PROPERTIES
Alberta Canada
Larger Sq Ft properties for production
Big Marble
Standing at a gargantuan 3.1 million square feet (72 acres), Big Marble is the largest Greenhouse in Alberta. It's home to over 496,000 cucumber plants; 385,400 tomato plants and 47,000 grow lights that add to the warm, sunny glow of our farm
https://bigmarble.ca/always-growing
C/M is intending to compliment In-House Brands with sub-Brands with multifaceted manufacturing & production yet some areas of food-drink will be covered others will not mainly as majority supply for Sydney Bennett's Food-Drink franchises then external invested interests
LARGEST ALBERTA CANADA WAREHOUSE
The largest warehouse building in Alberta is Amazon's "YYC4 Project Maverick" in Calgary, boasting 2.8 million square feet, according to Alberta Major Projects. This facility is also Amazon's largest by volume in Canada.
Here's more detail:
• Location: 6635 106 Avenue SE, East Shepard Industrial area of Calgary.
• Size: 2.8 million square feet.
• Significance: It's Amazon's biggest facility in Canada by volume.
• Construction: The building permit was issued in September 2021, with a grand opening in May 2024.
• Additional Information: The facility is known as a robotics distribution center.
The Amazon fulfillment center in Calgary, known as YYC4 Project Maverick, is a 2.8 million square foot building. It is located in the East Shepard Industrial area of Calgary. The building has 11-meter (approximately 36 feet) high ceilings. While not a skyscraper, its large footprint makes it a significant structure in the city's industrial landscape.
A 3-story building is typically between 30 and 40 feet tall. The exact height can vary based on ceiling heights (which can differ between floors) and other factors like building materials and local regulations.
Here's a more detailed breakdown:
• Average Story Height: Each story, or floor, is often around 10-12 feet high, according to Quora.
• Total Height: Multiplying the average story height by three gives a range of 30 to 36 feet. Some buildings may be slightly taller, especially if the first floor (often a retail or commercial space) has a higher ceiling height than the residential floors above, as noted by Walkable Eugene Citizens Advisory Network.
• Factors Influencing Height: Building codes, the intended use of the building (residential, commercial, etc.), and the construction materials used can all affect the overall height of a 3-story structure.
Amazon Calgary
Amazon has invested significantly in Calgary, with one notable facility, YYC4 Project Maverick, reportedly costing $400 million. This investment is part of a larger $40 billion investment in Canada since 2010. Another facility, YYC6 Project Violin, an AMXL fulfillment center specializing in heavy and bulky items, cost an estimated $131 million, according to storeys.com.
Here's a breakdown:
• YYC4 Project Maverick:
This 2.6-million-square-foot warehouse cost approximately $400 million, according to Western Investor.
• YYC6 Project Violin:
Amazon's first AMXL fulfillment center in Canada, located at 9705 68 St SE in Calgary, cost around $131 million.
• Total Investment:
Amazon has invested over $40 billion in Canada since 2010, with the Calgary facilities representing a significant portion of that.
The estimated cost for Amazon's Project Maverick warehouse (YYC4) in Calgary was $400 million, according to Alberta Major Projects. This 2.6-million-square-foot facility is located in the East Shepard Industrial area at 6635 106 Avenue SE. It is a state-of-the-art distribution center featuring Amazon Robotics technology.
HEIGHT CONSIDERATIONS WITH C/M
Taking a partial to full Bunker dug out effort then themed interior - exterior
Likely a 4-5 story dig from ground then controlled under 1-2 stories above on a smaller scale
CAST & FU*K OFF. I AM BUSY
NB-OT Labs wirelessly intervenes Dr Sydney N Bennett & P.K-K.T Labs on a snowboard retarded then some fu*k face saying rat-goof. A thumb in sh*t - tongue in arse or cheek kinda cut throat weirdo trying to make it big or to be sell out. Red Bull + a sh*t asking (rude interruptor)
Cast the shred donkey for a videa part & design for enthusiasts if he or she isn't to retarded. Red candies cannot understand mountains is not streets
Focused on Science & Tech with CIG
Stupid tongue in arsehole interrupting real works of progress
- Dr Sydney Nicola Bennett
WORK LIFE BALANCE
Perspective of CIG & Dr Sydney N Bennett
Seven steps.
1. Earn an education. Gain knowledge & skill then go to work. Earn a pay cheque!
2. Deduct personal expenses
3. Disposable income for savings & retirement savings then to purchase items (how to buy items for yourself)
4. Temporary Emergency between job personal social financial assistance exists (public charge welfare). Unless severely disabled not mild or moderately
5. Some people set up investments to grow their savings & set up multiple income streams
6. Don't forget your taxation strategy
7. Ensure you have time off to enjoy a social life & interests while maintaining a life of quality
Relevance - Irrelevance
HQ
https://citybennettprivate.blogspot.com/2025/07/cm-hq-manufacture-main-facility.html
Silo-Farming
https://citybennettprivate.blogspot.com/2025/07/cig-off-grid-silo-farms.html
Calgary
https://citybennettprivate.blogspot.com/2025/07/moving-cm-from-se-after-zoo-ne-small.html
Block 11
https://citybennettprivate.blogspot.com/2025/07/blog-post_17.html
PETS & ANIMALS
As a child & teenager the family of Dr Sydney N Bennett kept cats & dogs while it rained out
In College - University Dr Sydney N Bennett had a couppe cats then they shifted to one died in Renfrew county (age 12 born 2008) & another in Palm Springs (age 16 born 2006)
Dr Sydney N Bennett was & is known for altering ones body size & stature then look for different projects 2001-2025
NB-OT LABS + BRAD & LANA
North Bay & area Neurological Technology Labs
Brad Clinton Moore & sister Lana were hooked up first by NB-OT Labs then others they met pre-1993. They were going to Ferris Glen Public School. Living in Rutherglen, Ontario, Canada
St Joseph-Scollard Site Hospital had another Lab like Lakeview Sudbury then Laurentian University with Michael Persinger's Lab then a P.K-K.T Lab connected in Sudbury
Laurentian University with Michael Persinger's Lab then a P.K-K.T Lab connected in Sudbury like Lakeview Sudbury & St Joseph-Scollard Site Hospital were since moved & shut-down yet NB-OT Labs still operate like some others in Ontario
CIG




Comments
Post a Comment