CIG. M.D.E Calgary Site. Potential
CIG. M.D.E Calgary Site. Potential
CANADIAN MANUFACTURING - ALBERTA
Looking at a R&D facility & Shield Main + Partner network for Alberta connecting the remainder of Canada then European - International markets separate from USA
Under 100,000 Sq Ft & over 5 Million Sq Ft
Alberta competing equal to European - International markets separate from USA
C/M - SAD PLANET
Moving C/M from SE after Zoo-NE small slot to owned building NE
Commercial Listing. Over 70,000 Sq Ft
1324 36 Ave NE Calgary, AV T2E 8S1
$8-9.5 Million listing or under $10 Canadian
125,000 insurance & utilities
500,000 taxes
25,000 misc
650,000
54,167-75,000 monthly expenses average
125,000 monthly revenue (appointed minimal)
With renovations taxes raise from $190,000 up to just under $500,000
Tennant space would be altered to raise the roof & add some space for C/M & specifics
New front. Exterior walls & higher office space & double-triple height on warehouse space. $30 Million budget in total or under (cash sale)
Shopping sites. R&D + Manufacturing connected to larger external options
COMPARISON'S TO LARGE MANUFACTURING
The cost to build a 5 million sq ft warehouse can range from $100 million to over $300 million, depending on several factors. A basic pre-engineered metal building (PEMB) could cost around $20 per sq ft, while more complex designs like tilt-up construction could reach $60 per sq ft or more. Additional costs for interior finishes, site work, and specialized features can significantly increase the total price.
Here's a more detailed breakdown:
1. Construction Type:
Pre-engineered metal buildings (PEMB):
Generally the most cost-effective option, ranging from $20-$35 per sq ft.
Tilt-up construction:
Can range from $40-$55 per sq ft for materials, with total costs potentially reaching $140-$375 per sq ft including labor and other factors.
Structural Steel:
More expensive, costing $45-$60 per sq ft for materials, and $105-$330 per sq ft total.
Steel Frame:
Can range from $10-$20 per sq ft for basic structures, but can be higher with cladding, insulation, and fireproofing.
2. Additional Costs:
Interior finishes:
Office spaces, break rooms, and other specialized areas can add $100-$200 per sq ft or more.
Special features:
Loading docks, automated systems, and cold storage can significantly increase costs.
Site work:
Grading, foundations, and utility connections can add to the overall expense.
Technology additions:
Inventory management systems, security systems, and energy management systems can also add to the cost.
Location:
Land prices, labor rates, and local regulations can vary significantly by location.
3. Estimating Costs:
Basic warehouse shell:
A basic 5,000,000 sq ft warehouse could range from $100 million to $175 million.
Complex warehouse:
A more complex warehouse with specialized features could range from $200 million to over $300 million.
Example:
A basic 100,000 sq ft warehouse can cost between $2 million (PEMB) and $6 million (tilt-up construction with specialized features).Extrapolating this to 5,000,000 sq ft, you can expect costs to be at least 50 times higher.
In conclusion, building a 5 million sq ft warehouse is a large-scale project with significant costs. Thorough planning, including a detailed cost analysis, is crucial to ensure the project stays within budget.
Taxes are a concern in Alberta on larger US - Asian style larger manufacturing sites rather than spread out smaller grids of for local - regional options then international supply additives. Overall expenses
BUILD TIMES
Build time would have to be under 1 year not over 1.5 or 2
Calgary, Alberta: Springbank Callaway potentially
AI Collective Opinion
Building 5 million square feet of space would likely take several years, potentially 5-10 years or more, depending on the complexity of the project and various factors. This includes design and permitting, construction, and potential delays. It's not a quick process and requires significant planning and resources.
Here's a more detailed breakdown:
Factors Influencing Timeline:
Complexity:
A simple, repetitive structure like a warehouse will be faster to build than a complex building with intricate designs, multiple uses (like residential, commercial, and retail), or unique architectural features.
Design and Permitting:
The design phase, including architectural plans, engineering, and obtaining necessary permits, can take a significant amount of time, potentially 12-24 months.
Construction:
Construction itself can take anywhere from 2-5 years or even longer, depending on the scale and complexity.
Land Acquisition and Financing:
These are crucial initial steps that can add to the overall timeline. Finding suitable land and securing financing can take time.
Location:
Urban areas with strict zoning and design constraints can significantly increase the permitting process.
Weather Delays:
Inclement weather can cause delays, especially during certain stages of construction.
Material Availability and Supply Chain:
Delays in material procurement and supply chain disruptions can also impact the timeline.
Labor Availability:
Access to skilled labor can be a factor, especially for large projects.
Phased Construction:
Breaking the project into phases can help manage the schedule and reduce the overall construction time, but still requires significant time.
Market Conditions:
Economic downturns or changes in the market can affect the project timeline.
Example Timelines:
General Timeline:
A project of this scale could realistically take 5-10 years or more to complete, including all stages from initial planning to final occupancy.
Faster Scenario:
A highly optimized process, with minimal delays and standardized designs, could potentially be completed in a shorter timeframe, but this is less likely for a 5 million sq ft project.
In conclusion, building 5 million square feet is a substantial undertaking that requires careful planning, skilled execution, and a realistic understanding of the potential timeline, which is likely to be several years.
FURTHER DETAILED REQUESTS
A bunker design for seismic & tornados then high winds with above roof grade design for a court yard & test area
Likely a windy road & treed landscape with park setting above connected to in-out ground parking then signage doubling as a drive in theatre & classic diner action
MASS SCALE PRODUCTION
C/M Calgary at 5 Million Sq Ft could punch out over 1.5 Billion units annual in physical not digital production with larger size under the 2 million mark versus smaller scale in size competing with even a vast automotive & aviation or marine effort then connected for In-house & Partner brands then internal efforts
Block 11 hybrid stationary & conveyors keep with space savings while multi-layered cost controlling effort
In Comparison in Arizona, USA
Lucid Motors' manufacturing plant in Casa Grande, Arizona, has expanded to 3.85 million square feet, almost quadrupling its initial size. This expansion was completed in January 2024, in time for the production of the Lucid Gravity SUV. The expanded facility includes a new stamping plant, a dedicated powertrain production area, and can now produce up to 90,000 vehicles per year
This effort with C/M connecting to European - Asian output for the entire European - International market then a separate shield Grid for USA more like the European not Asian effort with connecting micro-manufacturing for supply & maintenance which works on a smaller scale in Canada & some other countries more than larger scale for logistics & costs
CIG IN CANADA
K.S-K.3 - S.B.G not R.B
Alberta (Calgary) - New Brunswick (Moncton) connected to a Toronto Stock Exchange rep in Canada
NB-OT Labs cannot even destroy CIG in Calgary, Alberta
K.S owns a residence. Leases space in the SE now due to transfer - growth plans in Canada separate from USA & European - International
NE. Avenue 30th & 1324. Sac-blues. Blue-sacs
https://www.loopnet.ca/Listing/1324-36th-Ave-NE-Calgary-AB/36077607/
The 5th Avenue NY - Zurich blues. Cowboy
Shield Retail connected with matching IMSRP as R&D custom center manufacturer
Calgary, Alberta is where CIG was first in Canada pre-1970's
USA is a newly isolated market
Calgary to Banff Corridor. Consider
Lands turned & a "DisneyLand" like Theme Park to compliment Calloway then MLB + increased options on variable buildings then economic interests expanding North America between Mountains & City
Potential mass investment opportunities
ROCKA VIEW. CALGARY TO BANFF
Rocky View County is a municipal district in southern Alberta, Canada that is named for its views of the nearby Rocky Mountains to the west. It surrounds most of Calgary, forming the city's northern boundary and most of the city's western and eastern boundaries. At a population of 41,028 in 2021, Rocky View County is the most populous municipal district in Alberta. Though predominantly rural in nature, Rocky View County is home to 14 hamlets, including Langdon, one of Alberta's most populous hamlets. Its rural areas are home to numerous country residential subdivisions.
Land. For.sale
https://www.realtor.ca/ab/
MOTOR DYNAMICS ENERGY PORTFOLIO
M.D.E is Privately Held like Sad Planet & all CIG In-House sub-brands yet some areas of allow quarterly private market open investment for profit sharing (dividends) while Space Dividend Stock, a publicly traded atock may invest in CIG Privately Held brands like others if not publicly shared domestic or international options
All CIG investment's are designed as break even profit sharing investment strategies
For profit
C/M with retail & maintenence then aftermarket parts & outfitting rather than OEM spreads opportunity in many categories with smaller fees for aftermarket VS OEM if third parties manufacture rather than invested in-house or contract externals
Calgary. Hailnados then Sunshine
https://vm.tiktok.com/ZMSsE82mR/
CIG


Comments
Post a Comment